Vista de página 14
Illustration 3.10: Fasten Front Screws and En-
sure Proper PE Connection
The two front screws are the PE connection to the front cover. Make sure that
both screws are mounted and fastened with the specified torque.
3.5. AC Grid Connection
Note:
When choosing the installation place, ensure that all labels are visible at all times.
For details refer to the section
Specifications
.
3. Installation