30 Installation Guide DLX series L00410622-01
If the inverter is set to master, data must be collected from the follower inverters. The
following screen is displayed:
7. Grid Configuration
Enter – Call up the list of grid configurations
Up or Down – Select the grid configuration of
the actual installation site:
TN/TT, IT, Undefined
Enter – Confirm
Left – Back
Right – Next
Enter – Confirm
8. Feeding Phase
Enter – Call up the list of phases
Up or Down Select the preferred phase:
- TN/TT: Not set, L1, L2, L3
- IT: Not set, L1-L2, L1-L3, L2-L3
EnterConfirm
Left – Back
Right – Next
Enter – Confirm
If the inverter is set to master, and there is more than one inverter in the plant, the
following screen is displayed: